Walnut Valley Unified School District modernized one of their high school recreational courtyards due to deterioration of an existing pour-in-place rubber system. The goal was to increase the courtyard's lifespan while improving aesthetics and addressing safety concerns

Insta4_editted.jpg

Background: With a strict budget to adhere to, Walnut Valley USD approached KYA for a cost-effective solution that would resolve the deterioration issue without fully replacing the pour-in-place system.

20131001_102718.jpg
20130514_122624.jpg

Method of Approach: KYA repaired and sealed the existing PIP system then overlaid synthetic turf ensuring a time-efficient and cost-effective method to avoid demolition. This method sustained the courtyard’s current ASTM safety rating with additional benefits of product longevity, high foot traffic, and improved aesthetics

20131001_102715.jpg
20140405_132409+%281%29.jpg
20140405_132431.jpg

Results: This application resulted in a renewed and appealing courtyard for students to enjoy along with the advantage of a maintenance-friendly facility for the district, and all within budget.

Insta4_editted.jpg