Case Studies

Exterior Pool Deck Construction - Pierce College Case Study

Exterior Pool Deck Construction - Pierce College Case Study

Pierce College was looking to make updates to their existing pool deck and restroom floors. They needed an anti-slip surface that would beautify the aquatic center and could be completed in a timely manner.

Exterior - Courtyard - Diamond Bar HS - Case Study

Exterior - Courtyard - Diamond Bar HS - Case Study

Walnut Valley Unified School District modernized one of their high school recreational courtyards due to deterioration of an existing pour-in-place rubber system. The goal was to increase the courtyard's lifespan while improving aesthetics and addressing safety concerns.

Interior - Flooring - East Side UHS - Case Study

Interior - Flooring - East Side UHS - Case Study

East Side UHSD needed flooring for a new portable office building they had installed within the District. The portable was used as a main office requiring floor design and solutions to withstand high foot traffic and present a modern work environment. 

Exterior - Turf - Yerba Buena HS - Case Study

Exterior - Turf - Yerba Buena HS - Case Study

Yerba Buena High School constructed a new pool on their campus. They envisioned beautifying a nearby space for students to congregate and relax during swim meets. To meet the District’s standards, grass or DG would need to be installed.

Interior - Flooring - Folsom Lake College - Case Study

Interior - Flooring - Folsom Lake College - Case Study

Folsom Lake College had a previous epoxy floor that was delaminated. The floor was chipping away due to the moisture issues in the slab, and eventually became a tripping hazard. The college had this project on their radar for several months, but they could not find the right time to fit in an essential project.

Exterior - Playground - Lillian J Rice - Case Study

Exterior - Playground - Lillian J Rice - Case Study

Chula Vista Unified School District recently modernized one of their elementary school playgrounds due to deterioration of an existing pour in place rubber tile system. KYA overlaid the existing system with synthetic turf and Playfall tiles, a time efficient and cost-effective method which avoids costly demolition.

Exterior - Playground - Valley Lindo - Case Study

Exterior - Playground - Valley Lindo - Case Study

KYA upgraded a 2600 square foot deteriorating rubber tile playground surface with Custom Manufactured Substrate tiles and synthetic grass to create a resilient and safe playground system for the Chula Vista Elementary School District.

Interior - Basketball Court Rebuild - Valley HS - Case Study

Interior - Basketball Court Rebuild - Valley HS - Case Study

The Valley High School gym is a little over 12,000 square feet and was in need of a complete rebuild after an explosion. The installed floor is a natural maple on top of ½” plywood. It sits on top of a multi layered sleeper system that raises the floor 20” off the substrate. The sealer, finish and paint products are Bona Sports and the custom logo was done by an artist.